Restoring the connectivity of the Gilort River

Restoring the connectivity of the Gilort River

Within the Fish for Life project, two functional passages for fish will be built, functional on two spillway thresholds on the Gilort River (at Albeni and Targu Carbunesti), which will ensure the longitudinal connectivity for 175 km of river in two Natura 2000 sites (the Gilort River and Jiu Corridor).