The feasibility studies for the two fish passages to be carried out within the FishForLife project have been completed. The two sites where the fish passages will be made are located in Albeni and Targu Carbunesti, near the road bridges over Gilort River. In the two points, in 2014 two spillway thresholds were built that do not allow upstream migration of fish species targeted by our project.
Month: May 2019
Evaluation of Ecosystem Services
Between 2 and 6 May, 2019, the Fish for Life project implementation team conducted a campaign to collect water samples and in-situ measurements of water chemical parameters from Gilort River and two of its main tributaries, Galbenu and Blahnita. The team led by Dr. Marius Matache performed in-situ measurements of dissolved oxygen, nitrite and ammonium and took water samples for laboratory determination of nitrogen, phosphate and total phosphorus indicators.