If at the beginning of the year we announced the reception by APM Gorj of the technical design, on April 9, 2021 the works for the fish passage from Târgu Cărbunești started. The existing overflow threshold formed an artificial waterfall that the fish could not cross in their attempt to reach the upstream. In order to allow the passage of fish, it was decided to build a passage of the "ladder with vertical slots" type that includes 22 pools, properly sized for the migration of target species. In order to help the fish species to cross the area at very high flows also, on the right bank one shall setup a ramp made of rocks embedded in the concrete. The ramp will have a length of 15 m and a maximum width of 5 m.
Month: April 2021
Services procurement – Specialized design for the implementation of the ecological reconstruction measures
In order to implement the conservation measures of the protected species of fish in the Gilort River, provided within the Fish for LIFE project, the Gorj Environmental Protection Agency requests offers for the specialized design for the realization of ecological reconstruction works proposed within the project. We ask interested companies to submit offers for the design of these works necessary to improve the heterogeneity of aquatic habitats and the hydromor